1.BIM Spatial Analysis for Facility Planning
spatial analysis dashboard · 2026
This dashboard displays a spatial analysis generated for a BIM engineer needing to verify IFC floor-area breakdowns ahead of a contractor handoff. The top KPI cards immediately highlight a data discrepancy: a Storey Gross Area of 25.75 m² (inferred from a slab) against a Modeled Net Area of 24.58 m². This results in an implausibly high Net-to-Gross ratio of 95.46%, leaving an Unassigned Gap. Such spatial audits are illustrative of the rigorous floorplan analysis required when designing layouts for cellular manufacturing or other specialized production zones.
What it shows:
How to verify IFC floor-area breakdowns and identify spatial data discrepancies before contractor handoff.




